J. & M. Manufacturing Co., Inc.P.O. Box 547Fort Recovery, OH 45846Phone: (419) 375 2376 Fax: (419) 375-2708E-mail: [email protected] Websit
10IStep 1 - Install both spindles. Use (2) 1” x 9” Hex Bolts and (2) 1” Centerlock Hex Nuts to attach the spindles to the cart. Next slip t
11IStep 4 - Slide the tracks onto the spindle. Step 5 - Slip the 6” Rubber O-Ring onto the spindle, pushing it up against the track spindl
12P
13P# Description Part. No.1 2-1/2” ID Bronze Bushing JM00168412 Bogie Wheel Swivel Weldment JM00202563 1”-8 Gr5 Z Centerlock Hex Nut JM00021494 1”
14TITLEP
15TITLE# Part. No. Description1 JM0020273 Track Carriage Beam Frame Weldment2 JM0020350 6” ID Bronze Bushing3 JM0016687 1”-8 X 4-1/2” Gr5 Z Hex Bolt4
16NDATE NOTE
2To The DealerTO THE DEALER:Read manual instructions and safety rules. Make sure all items on the Dealer’s Pre-Delivery and Delivery Check Lists in t
3TITLETo The Dealer SpecificaTionSABCSpecicationsTrack Width 36”Idler Width (eective) 36”Overall Length (A) 146”Idler Diameter 36”Roller Diameter 12
4General inforTmaTionBOLT TORQUE CHARTAlways tighten hardware to these values unless a dierent torque or tightening procedure is listed for a specif-
5SafeTy ruleSGeneral inforTmaTionATTENTION! BECOME ALERT! YOUR SAFETY IS INVOLVED!Safety is a primary concern in the design and manufacture of our p
6SLubrication Service ScheduleIMPORTANT: Your Track System has grease ttings at all critical points. ese should be serviced before the track i
7R MWARNING: When Servicing e Track System, Be Certain All Power To Grain Cart Is Shut O.Repack the wheel bearings at least once a
8SAIR BAG REPLACEMENTIf replacement of the track tension air springs become necessary, the following steps must be performed:1. Slowly release
9SBELT INSPECTIONe rubber track is composed of several layers of cable, similar to the cables used in automotive tires. e most important set
Comentários a estes Manuais